Home/Applications/XLPE Cable Compound

Application · Cable Compound

XLPE Cable Compound: Silane Grafting Two-Step Process

Silane cross-linked PE must be grafted first and catalysed later. Do both in one pass and the compound starts cross-linking inside the barrel — which is a one-day cleaning job, not a quality deviation. A reference xlpe cable compound page from Kerke.

XLPE Cable Compound — workshop photo 1, Kerke workshop, NanjingXLPE Cable Compound — workshop photo 1, Kerke workshop, Nanjing
XLPE Cable Compound — workshop photo 2, Kerke workshop, NanjingXLPE Cable Compound — workshop photo 2, Kerke workshop, Nanjing
XLPE Cable Compound — workshop photo 3, Kerke workshop, NanjingXLPE Cable Compound — workshop photo 3, Kerke workshop, Nanjing
XLPE Cable Compound — workshop photo 4, Kerke workshop, NanjingXLPE Cable Compound — workshop photo 4, Kerke workshop, Nanjing
XLPE Cable Compound — workshop photo 5, Kerke workshop, NanjingXLPE Cable Compound — workshop photo 5, Kerke workshop, Nanjing
XLPE Cable Compound — workshop photo 6, Kerke workshop, NanjingXLPE Cable Compound — workshop photo 6, Kerke workshop, Nanjing
Running video — XLPE Cable Compound, Kerke workshop
Running video — XLPE Cable Compound, Kerke workshop

Quick answer

XLPE (cross-linked polyethylene) cable compound is produced on a two-stage line that keeps melt temperature below the cross-linking initiation point, with L/D 32–40 in the first stage and air-cooled pelletizing. Output 200–1,500 kg/h. Silane or peroxide systems each need a different temperature ceiling.

190–210 °Cgrafting zone
2 stepsgraft, then catalyse
<0.1%moisture before packing

Workshop photos and a running video — shot on our own lines, not stock images.

What sets the limit

PE, silane, peroxide and antioxidant are metered and compounded below the initiation temperature, then pelletized with air cooling and packed in moisture-barrier bags.

Table 1. Key parameters for xlpe cable compound line. Reference values — confirm on a material trial.
ParameterValue / range
SystemsSilane cross-linked PE / peroxide XLPE
Temperature ceilingBelow cross-linking initiation (typ. 150–170 °C)
PelletizingAir-cooled hot die-face or strand
Output (reference)200–1,500 kg/h
ModelKTE/SE-75/180, KTE/SE-95/200

Output figures are measured on the reference material stated above. Filler grade, bulk density and moisture move output by ±15% — that is why every quotation we issue is tied to a trial report.

Process flow, step by step

  1. FeedingLoss-in-weight dosing of polymer and filler; side feeder or liquid injection where the formulation needs it.
  2. Melting and dispersingScrew geometry with 45°/90° kneading blocks; barrel profile set by the polymer.
  3. DevolatilizationVacuum vent at −0.06 to −0.09 MPa removes moisture and volatiles before the die.
  4. Pressure build-upThrottle or discharge section stabilises die pressure; a melt pump where gauge control matters.
  5. Pelletizing and packingAir-cooled hot die-face or strand; then centrifugal dryer, vibrating screen and bagging.

Equipment configuration

Table 2. What the line is made of, and why each part is specified that way.
StageEquipmentWhy this choice
Main machineTwo-Stage Extruder KTE/SEArchitecture follows the filling level and the mixing duty, not the required tonnage.
Screw geometryBuilding-block elements, W6Mo5Cr4V2, bimetallic linerWear package for abrasive filler; mixing blocks only where dispersion demands them.
FeedingLoss-in-weight feeder, side feeder where neededRecipe accuracy: ±0.5% short term on the weighed component.
PelletizingPelletizing systemChosen by polymer and filler ceiling — water contact is the deciding column.
DownstreamCentrifugal dryer, vibrating screen, baggingFines below 2% and moisture below the specification of your downstream process.

Output by model

Table 3. Two-stage KTE/SE — reference output. Full range on the machine page.
ConfigurationStage 1 (twin screw)Stage 2 (single screw)Output (kg/h)Typical product
KTE-50B / SE-12050.5 mm120 mm300–500Colour / filler masterbatch
KTE-65B / SE-15062.4 mm150 mm500–800Filler masterbatch 85%, PVC
KTE-75B / SE-18071 mm180 mm700–1,200High filler 88–90%, HFFR
KTE-95B / SE-20093 mm200 mm1,000–2,000High filler, cable compound

Three mistakes that cost the most

1. A 10 °C overshoot starts cross-linking inside the barrel: gel particles block the cable di

A 10 °C overshoot starts cross-linking inside the barrel: gel particles block the cable die downstream.

2. Moisture pickup in packing ruins the shelf life of silane XLPE.

Moisture pickup in packing ruins the shelf life of silane XLPE.

3. No melt filtration before the cable head

No melt filtration before the cable head — a single gel particle scraps a whole reel; specify a fine screen changer and trend the die pressure.

FAQ

Can you guarantee no pre-cross-linking?

We guarantee temperature control (±2 °C) and residence time; actual pre-cure is verified by a gel-content test on your formulation in a trial.

Strand or hot die-face for XLPE?

Both are used; hot die-face with air cooling is more common for cable compound because pellet surface quality matters.

What output can you guarantee for this application?

The reference band is 200–1,500 kg/h, measured on the stated material. We quote a guaranteed figure only after a trial on your own material, because filler grade, bulk density and moisture move output by ±15%.

Can we run our material before ordering?

Yes — send 25–50 kg. We return pellets, a running video and a report with temperatures, screw speed, feeder settings and output per hour. The trial is free; you cover the freight.

What is the delivery time?

30–45 working days for standard configurations, 45–70 for custom screw geometry and ODM work. Voltage and frequency are built for the destination country.

Where these numbers come from

Parameters are taken from the Kerke product parameter table and the product master data sheet, and cross-checked against commissioning records for lines in the same application. Formulations and temperature windows are typical industry values, not a recommendation for your specific compound — every figure marked reference must be confirmed on a material trial before it becomes a contractual number.

Reviewed by the Kerke process team, Nanjing. Page updated 6 November 2026.

Tell us your material — we will tell you the line

Send 25–50 kg and we run it on our lab extruder: pellets, running video and a capacity report back in 3–7 days.

XLPE cable compound — the short version

Note on xlpe cable compound: the numbers above are reference ranges from Kerke's own trial runs, not catalogue promises. Screw geometry, wear package and pelletizing method are set on the trial bench first, so the output you compare is the output you get. If your grade is not in the tables, send it — the closest configuration is usually a change of screw set, not a different machine.

Related on this site: Machine range: KTE-50B to 135D · Pelletizing methods compared · quotation and free trial · Wikipedia: Masterbatch