Since 2009 · 2,000+ sets · 70+ countries WhatsApp +86 177 3333 2876

Turnkey plant

Turnkey Masterbatch Plant: feeder to bagging

Buying four machines from four suppliers is how a plant ends up with a feeder that does not match the throat, a pelletizer that floods the dryer and a control system with three HMI languages. One turnkey masterbatch plant scope, one acceptance test.

  • Single scope: dosing, extrusion, pelletizing, drying, conveying, bagging
  • Layout drawing and utility schedule before shipment
  • Acceptance test with your material, record shipped with the plant
250–750 kg/htypical turnkey output
1 scopefeeder to bagging, one acceptance test
30–70 daysdelivery by configuration

Get a costed configuration

Reply within one working day, in English or Chinese.

Thank you — your enquiry is in. We reply within one working day; if it is urgent, WhatsApp +86 177 3333 2876.

Please check your name and email.

We use your details only to answer this enquiry. No newsletter, no list sharing.

Turnkey masterbatch line from feeder to pelletizer on the assembly floor
A turnkey masterbatch line from feeder to pelletizer, staged on the assembly floor.
2,000+ setsdelivered since 2009
In-house screwselements, shafts and liners machined on site
24–48 hspare parts dispatch, standard sizes
70+ countriescommissioning experience
turnkey masterbatch plant
Two-stage twin screw extruder at the core of a turnkey masterbatch plant, with gravimetric dosing upstream.

Where turnkey plants lose money

The extruder is the part everyone compares. In a turnkey masterbatch plant the losses usually sit in the interfaces: feed throat, conveying, dryer capacity, bagging rate.

The feed throat interface

A gravimetric feeder sized for 800 kg/h of CaCO₃ at 0.9 bulk density delivers far less at 0.45. The throat, the agitator and the feeder are one design problem, and they are usually bought as three — the classic turnkey masterbatch plant failure.

Conveying and storage

Pneumatic conveying of filled compound abrades elbows and creates fines. The layout decides how much; a drawing before shipment is cheaper than a rebuild after installation.

One control philosophy

Recipe, alarms and data logging in one system. Three HMIs from three suppliers means three sets of spare parts and no single record of a batch.

  • Material flow and layout drawing
  • Gravimetric dosing for polymer, filler and additives
  • Vacuum devolatilization and melt filtration where needed
  • Pelletizing, drying, screening and conveying
  • Bagging or bulk loading at the line rate
  • Commissioning, training and a recommended spare set

Typical turnkey masterbatch plant scopes

ScopeOutput (reference)Core machineIncludes
Filler masterbatch plant350–750 kg/hKTE-75B / KTE-95Bdosing, extrusion, water ring, dryer, bagging
Colour masterbatch plant150–400 kg/hKTE-65B / KTE-75Bdosing, extrusion, strand pelletizing, bagging
Engineering plastics plant140–300 kg/hKTE-65Ddrying, side feeder, vacuum, strand pelletizing
Recycling plant300–1,000 kg/hKTE-95 / two-stagefeeding, filtration, underwater pelletizing, dewatering

Reference values, subject to material trial. Final parameters are set on your own material.

Questions buyers ask before the call

Do you do the installation?

We supply drawings, a commissioning engineer and training; installation supervision travel is quoted separately. Most customers use a local rigging team with our engineer on site for the first run.

What is the delivery time for a full plant?

30–45 working days for a standard single-line plant, 45–70 for a multi-line layout with custom conveying. Every machine of the turnkey masterbatch plant is test-run with material before shipment.

Can the plant be expanded later?

Yes, if the layout is planned for it. We size the conveying and the utility headers for the second line at the start, which is a small cost now and a large one later.

Masterbatch plant lines staged before installation and commissioning
Plant-scale lines staged before container loading and commissioning.

Send the plant brief — get a layout and a scope

Products, output per line, available floor area and power supply. That is enough for a layout drawing and a turnkey masterbatch plant scope with the interfaces named.

Get the quotation
Kerke Extrusion Equipment · Nanjing, Jiangsu, China. Every turnkey masterbatch plant is test-run on the customer's own material before shipment. Values are reference ranges, subject to material trial. © Uptech — exclusive export partner of Kerke Extrusion.