Home/Applications/TPE/TPU/TPR Pelletizing

Application · Thermoplastic Elastomer

TPE/TPU/TPR Pelletizing: Hardness 30–90A

Elastomer compounding is dominated by oil: SEBS takes 100–300 phr, and injecting it all at once makes the screw slip instead of mix. Split the injection and the same machine behaves. A reference tpe tpu tpr pelletizing page from Kerke.

TPE TPU TPR Pelletizing — workshop photo 1, Kerke workshop, NanjingTPE TPU TPR Pelletizing — workshop photo 1, Kerke workshop, Nanjing
TPE TPU TPR Pelletizing — workshop photo 2, Kerke workshop, NanjingTPE TPU TPR Pelletizing — workshop photo 2, Kerke workshop, Nanjing
TPE TPU TPR Pelletizing — workshop photo 3, Kerke workshop, NanjingTPE TPU TPR Pelletizing — workshop photo 3, Kerke workshop, Nanjing
TPE TPU TPR Pelletizing — workshop photo 4, Kerke workshop, NanjingTPE TPU TPR Pelletizing — workshop photo 4, Kerke workshop, Nanjing
TPE TPU TPR Pelletizing — workshop photo 5, Kerke workshop, NanjingTPE TPU TPR Pelletizing — workshop photo 5, Kerke workshop, Nanjing
TPE TPU TPR Pelletizing — workshop photo 6, Kerke workshop, NanjingTPE TPU TPR Pelletizing — workshop photo 6, Kerke workshop, Nanjing
Running video — TPE TPU TPR Pelletizing, Kerke workshop
Running video — TPE TPU TPR Pelletizing, Kerke workshop

Quick answer

TPE, TPU and TPR compounds from Shore 30A to 90A run on a twin screw with L/D 44–52 and underwater pelletizing for round, free-flowing pellets. Output 200–1,500 kg/h. SEBS oil absorption and TPV dynamic vulcanization need different screw designs.

30–90Ahardness range
44–60screw L/D
2 injectionsoil dosing

Workshop photos and a running video — shot on our own lines, not stock images.

What sets the limit

SEBS or base polymer is fed with oil in a dedicated absorption zone, compounded with PP and filler, then underwater pelletized. TPV requires a dynamic vulcanization zone with controlled residence time.

Table 1. Key parameters for tpe / tpu / tpr elastomer line. Reference values — confirm on a material trial.
ParameterValue / range
HardnessShore 30A–90A (TPE/TPU/TPR range)
L/D44–52
Oil absorptionUp to 3× rubber weight for SEBS
PelletizingUnderwater (round pellets, no blocking)
Output (reference)200–1,500 kg/h
ModelKTE-65B, KTE-75B

Output figures are measured on the reference material stated above. Filler grade, bulk density and moisture move output by ±15% — that is why every quotation we issue is tied to a trial report.

Process flow, step by step

  1. FeedingLoss-in-weight dosing of polymer and filler; side feeder or liquid injection where the formulation needs it.
  2. Melting and dispersingScrew geometry with 45°/90° kneading blocks; barrel profile set by the polymer.
  3. DevolatilizationVacuum vent at −0.06 to −0.09 MPa removes moisture and volatiles before the die.
  4. Pressure build-upThrottle or discharge section stabilises die pressure; a melt pump where gauge control matters.
  5. Pelletizing and packingUnderwater (round pellets, no blocking); then centrifugal dryer, vibrating screen and bagging.

Equipment configuration

Table 2. What the line is made of, and why each part is specified that way.
StageEquipmentWhy this choice
Main machineCo-Rotating Twin Screw ExtruderArchitecture follows the filling level and the mixing duty, not the required tonnage.
Screw geometryBuilding-block elements, W6Mo5Cr4V2, bimetallic linerWear package for abrasive filler; mixing blocks only where dispersion demands them.
FeedingLoss-in-weight feeder, side feeder where neededRecipe accuracy: ±0.5% short term on the weighed component.
PelletizingPelletizing systemChosen by polymer and filler ceiling — water contact is the deciding column.
DownstreamCentrifugal dryer, vibrating screen, baggingFines below 2% and moisture below the specification of your downstream process.

Output by model

Table 3. Co-rotating twin screw KTE — reference output. Full range on the machine page.
ModelDia. (mm)Speed (rpm)Motor (kW)Torque (N·m)Output (kg/h)
KTE-50B50.5500–60055–752×52580–200
KTE-50D50.5300–80075–902×860100–300
KTE-52B51.4500–60055–752×72080–200
KTE-52D51.4500–60075–1102×1050100–400
KTE-65B62.4500–60090–1102×860200–450
KTE-65D62.4300–800132–1602×1530350–600
KTE-75B71500–600132–1602×1530300–800
KTE-75D71300–800200–3152×2100500–1000
KTE-85B85500–600220–3152×2100550–1000
KTE-95B93500–600250–3152×3000800–1500
KTE-95D93500–800315–5002×48001000–2000
KTE-135B135500–600315–5002×48001500–3000
KTE-135D135500–800500–10002×78001500–4000

Three mistakes that cost the most

1. Oil added too early

Oil added too early — the feed throat slips and output fluctuates.

2. Strand pelletizing TPE gives sticky, blocking pellets; underwater is the practical choice.

Strand pelletizing TPE gives sticky, blocking pellets; underwater is the practical choice.

3. TPU run wet

TPU run wet — 0.1% moisture gives bubbles in the pellet and drifting hardness; dry 80–90 °C for 2–3 h and keep the opened bags resealed.

FAQ

Can one line run TPE and TPV?

Yes with a screw set change; TPV needs a longer vulcanization zone and tighter temperature control.

What oil ratio is feasible?

Up to 3:1 oil to rubber for soft grades; above that the melt strength is too low for pelletizing.

What output can you guarantee for this application?

The reference band is 200–1,500 kg/h, measured on the stated material. We quote a guaranteed figure only after a trial on your own material, because filler grade, bulk density and moisture move output by ±15%.

Can we run our material before ordering?

Yes — send 25–50 kg. We return pellets, a running video and a report with temperatures, screw speed, feeder settings and output per hour. The trial is free; you cover the freight.

What is the delivery time?

30–45 working days for standard configurations, 45–70 for custom screw geometry and ODM work. Voltage and frequency are built for the destination country.

Where these numbers come from

Parameters are taken from the Kerke product parameter table and the product master data sheet, and cross-checked against commissioning records for lines in the same application. Formulations and temperature windows are typical industry values, not a recommendation for your specific compound — every figure marked reference must be confirmed on a material trial before it becomes a contractual number.

Reviewed by the Kerke process team, Nanjing. Page updated 6 November 2026.

Tell us your material — we will tell you the line

Send 25–50 kg and we run it on our lab extruder: pellets, running video and a capacity report back in 3–7 days.

TPE TPU TPR pelletizing — the short version

Note on tpe tpu tpr pelletizing: the numbers above are reference ranges from Kerke's own trial runs, not catalogue promises. Screw geometry, wear package and pelletizing method are set on the trial bench first, so the output you compare is the output you get. If your grade is not in the tables, send it — the closest configuration is usually a change of screw set, not a different machine.

Related on this site: Machine range: KTE-50B to 135D · Pelletizing methods compared · quotation and free trial · Wikipedia: Masterbatch