Company · News
Chinaplas 2026, Shanghai: Hall 6.1, booth D46 — meet Kerke in April
The 38th China International Plastics & Rubber Exhibition runs 21–24 April 2026 at the National Exhibition and Convention Center in Shanghai. Kerke and partner GCMT will be in Hall 6.1, booth D46 — pre-register before 17 April, 17:00 for free fast-track entry.

Quick answer
Kerke exhibits at Chinaplas 2026 from 21 to 24 April 2026 at the National Exhibition and Convention Center (NECC), Shanghai — Hall 6.1, booth D46. Together with our partner GCMT (Jiangsu Gongchuang), we will show the KTE co-rotating twin screw platform, the KTE-T triple screw and two-stage KTE/SE lines, and take live formulation questions on the stand. Register before 17 April 2026, 17:00 and entry to the show is free.
What we are bringing
The booth program follows the same rule as every Kerke stand: machines that answer a specific formulation question, not a catalogue wall.
- KTE twin screw platform. Lab (KTE-16/20/25D/36B), pilot (KTE-50/52) and production (KTE-65 to KTE-135D) machines share one screw geometry — a formulation proven small scales without re-inventing the profile.
- KTE-T triple screw. Three-screw geometry for dispersion-limited masterbatch and degassing-heavy recipes.
- Two-stage KTE/SE lines. Twin screw compounding plus single screw metering — the standard answer for heat-sensitive products, XLPE and PET work.
- Wear parts, machined in-house. Screw elements, shafts, barrels and liners from our Nanjing works; replacement packages quoted per material, shipped in 24–48 hours.
An engineer who has run your material class will be on the booth all four days — bring the recipe, not just the brochure.
How to get in free
| Item | Detail |
|---|---|
| Pre-registration deadline | 17 April 2026, 17:00 (CST) |
| Invitation code | WPLXDOKLW — scan the QR on our invitation, complete registration, enter free |
| On-site registration | Paid; allow queue time at the visitor counters |
| Show info mini-program | "Chinaplas 观展通" — floor plans, exhibitor search, session schedule |
Planning your visit
NECC Shanghai sits on Metro Line 2 (Xujing East) and Line 17; from Hongqiao hub it is one stop. Shanghai to our Nanjing works is under two hours by high-speed rail, so if you want to see a line run with your material, a factory day after the show is easy to fit — we run trials on lab extruders in 3–7 days with pellets, video, temperatures and output per hour as the deliverable.
Booth 6.1D46 is in Hall 6.1, the compounding and pelletizing section. If you tell us in advance which material you will bring, we can have the closest delivered configuration's screw drawing on the table when you arrive.
Can't wait until April?
Every machine Kerke sells is built and run in one place: screw elements, shafts and barrels are machined in our Nanjing works, gearboxes are assembled and run in for 24 hours, and every line is tested with material before it ships. Send 25–50 kg of your material now and we run it on a lab extruder before the show — you can collect the pellets and running data at booth 6.1D46.
Related on this site: All exhibition news · Chinaplas 2025 report · Inside the factory · Machine overview
FAQ
What will be on the stand at Chinaplas 2026
The KTE platform, KTE-T triple screw, two-stage KTE/SE lines and in-house wear parts, with partner GCMT. Hall 6.1, booth D46 at NECC Shanghai.
Can I still get the Chinaplas 2026 stand report?
Yes - write to kerkepm@gmail.com with the show name in the subject; the deck with the machine configurations shown and their measured outputs comes back within one working day.
Which exhibition comes next?
InterPlas Thailand 2026 - booth 4B08 at BITEC, 17-20 June.
Tell us your material and target output before the show; we will confirm booth meeting slots, or run your trial at the works in 3–7 days.
