Home/Knowledge/Machines & Selection/Factory Planning Table

Selection guide · 5 min read

Factory Planning Table: Power, Footprint & Water per Machine Size

Plan the utilities before the machine ships. This table consolidates Kerke factory-configuration requirements per frame size — total connected power, actual consumption, floor space, water and staffing.

Short answer: Plan the utilities before the machine ships. This table consolidates Kerke factory-configuration requirements per frame size — total connected power, actual consumption, floor space, water and staffing.

Installation requirements by machine

MachineConnected powerActual drawFootprint L×W×HWorkersMixer (included size)Container
KTE-2014 kW10 kW·h4×0.7×1.9 m15 L, 2.2 kW20GP
KTE-3645/50 kW30/35 kW·h10.5×3×2.5 m2–3100 L, 22 kW20GP
KTE-5085/95 kW60/65 kW·h17×3×2.5 m2–3200 L, 45 kW20GP
KTE-65130/145 kW90/100 kW·h20×4×2.5 m3–4300 L, 55 kW40HQ
KTE-75190/215 kW130/145 kW·h22×4×3 m3–4500 L, 75 kW40HQ
KTE-95370/435 kW260/305 kW·h24×4×3 m3–41000 L, 110 kW40HQ

Footprint excludes the high-speed mixer and conveyor loader (add ~2.1–2.8 m depth); air-cooling hot-face pelletizer versions add roughly 20×4×2.5 m of line length.

Media conditions (what your plant must supply)

  • Power: 3×380 V 50 Hz + N + PE, ±5% tolerance — other voltages must be specified at order time
  • Barrel cooling water: 5–80°C, soft or distilled water only — hard water scale plugs the cooling solenoid valves and causes zone overheating
  • Compressed air: 0.5 m³/min at 0.7–1.25 MPa
  • Ambient: −15 to 50°C, humidity <95%

Customer-supplied items (often forgotten)

Air-cooled chiller 10 HP, air compressor 2.2 kW, plant cabling, gear oil, hydraulic oil, cooling water piping, water/air circuits. A cross-check against a real KTE-65B line quote: ~225 kW connected for the whole line including mixer, ~150 kW/h actual draw, 40×5×4 m total — quote host machine and full-line figures separately to avoid disputes.

Planning rules that save money

  1. Size the water tower for summer peak, not average — undersized cooling shows up as wet pellets and stringing.
  2. Reserve 1.5× the machine footprint for maintenance access and screw pull-out.
  3. Check your local voltage before ordering; heater and motor specifications change with it.

Reading the table for a real layout

FrameConnected powerRunning load (typical)Footprint (L × W)Cooling waterAir
KTE-36D22–37 kW60–70%4.0 × 2.5 m0.3 m³/h0.3 m³/min
KTE-50D75–90 kW65–75%5.0 × 3.0 m0.6 m³/h0.5 m³/min
KTE-65D132–160 kW65–80%6.5 × 3.5 m1.0 m³/h0.8 m³/min
KTE-75D200–315 kW70–80%7.5 × 4.0 m1.5 m³/h1.0 m³/min
KTE-95D315–500 kW70–80%9.0 × 5.0 m2.5 m³/h1.5 m³/min

Add to every row: 1.5 m clear at the die end, 1 m at the feed end, and a 2 m maintenance aisle on one long side. The footprint above is the machine skid, not the line — a complete filler line with mixer, feeder, strand bath and pelletizer typically needs 2.2–2.6× the skid length.

Utilities cost, not just capacity

Electrical installation for a 65 mm line runs 8–12% of machine value in most markets; the transformer and cable gauge are set by connected power, not running load. Water matters more than most buyers expect: at 1 m³/h with a 10°C rise, a closed loop with a 2 m³ tank and a 5 kW chiller covers a 65 mm line, while an open loop wastes 20–30 m³/day.

Layout checks that avoid rebuilds

  • Put the transformer within 15 m of the control cabinet; longer runs need a bigger cable, not a bigger transformer.
  • Reserve 1.2 m above the feed throat for the loader and 1.5 m at the side feeder.
  • Slope the floor 1–2% toward a drain; washdown water finds every low point.
  • Leave a 1 m gap between the gearbox and the wall for oil changes and coupling access.
  • Plan compressed air at 0.6 MPa and 0.8 m³/min minimum for a 65 mm line with gravimetric feeding.

What to send with your enquiry

  • The frame size and full line scope: mixer, feeder, pelletizer, conveying, silo.
  • Available transformer capacity and the distance to your distribution board.
  • Water source: closed loop with chiller, or once-through — the choice changes daily consumption by 20×.
  • Ceiling height and floor loading, especially for mezzanine feeding systems.
  • Future expansion plans, because a second line needs shared utilities sized now.

Bottom line

Utilities are decided before the machine ships and are far cheaper to plan than to retrofit. Connected power sets the transformer, the transformer sets the electrical budget, and cooling water sets the chiller. Reserve 2.2–2.6× the skid footprint for a complete line, and put the transformer within 15 m of the cabinet.

FAQ

Can I run a 65 mm line on a 100 kVA transformer?

No. Connected power of 132–160 kW needs a transformer sized on starting current, typically 200–250 kVA. Undersizing shows up as breaker trips at start, not during running.

How much cooling water does a lab line need?

Under 0.2 m³/h for a 20–25 mm frame. A 200 L tank and a small chiller is enough.

Do I need a compressed air dryer?

Yes for gravimetric feeders and pneumatic conveying. Moisture in the air line causes feeder drift that looks like a calibration fault.

What ceiling height is required?

4.5 m for a 65 mm line with a volumetric loader, 5.5 m if you add a silo and pneumatic conveying above the machine.

Where these numbers come from

Figures in this page are drawn from KTE parameter tables, shaft design notes, cross-checked against delivered-line commissioning records. They are typical published practice — run trials on your own material before fixing production settings.

Factory Planning Table — the short version

Related on this site: Twin vs single screw · Energy: specific consumption · Capacity by material