{"id":32,"date":"2026-11-06T19:04:40","date_gmt":"2026-11-06T11:04:40","guid":{"rendered":"https:\/\/kerkepm.com\/applications\/masterbatch-turnkey\/"},"modified":"2026-11-11T23:40:54","modified_gmt":"2026-11-11T15:40:54","slug":"masterbatch-production-line","status":"publish","type":"page","link":"https:\/\/kerkepm.com\/es\/applications\/masterbatch-production-line\/","title":{"rendered":"Masterbatch Production Line"},"content":{"rendered":"<div class=\"k3\">\n<noscript><iframe loading=\"lazy\" src=\"https:\/\/www.googletagmanager.com\/ns.html?id=GTM-5JN495RG\" height=\"0\" width=\"0\" style=\"display:none;visibility:hidden\"><\/iframe><\/noscript>\n<div class=\"wrap\"><div class=\"crumbs\"><a href=\"\/\">Home<\/a><span>\/<\/span><a href=\"\/applications\/\">Applications<\/a><span>\/<\/span>Masterbatch Production Line<\/div><\/div><div class=\"wrap\"><div class=\"hero\">\n<p class=\"kicker\">Application \u00b7 Plastic Masterbatch<\/p>\n<h1>Masterbatch Production Line: Filler, Color & Functional in One Plant<\/h1>\n<p class=\"dek\">A masterbatch plant is a feeding system, an extruder, a pelletizer and a material-handling skeleton. Buying them as four separate decisions is how plants end up with a bottleneck at the bagging station. A reference masterbatch production line page from Kerke.<\/p>\n<div class=\"byline\"><div><b>Updated<\/b> 6 November 2026<\/div>\n<div><b>Output<\/b> 100\u20134,000 kg\/h<\/div>\n<div><b>Line type<\/b> Two-stage KTE\/SE<\/div>\n<div><b>Basis<\/b> parameter table + material trial<\/div><\/div>\n<\/div><\/div>\n<div class=\"wrap\"><div class=\"appmedia\">\n<div class=\"mslider\" id=\"appslider\">\n<div class=\"ms-frame\"><div class=\"ms-slide on\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/11\/masterbatch-turnkey-s1.webp\" alt=\"Masterbatch Production Line \u2014 workshop photo 1, Kerke workshop, Nanjing\" loading=\"lazy\"><span class=\"ms-cap\">Masterbatch Production Line \u2014 workshop photo 1, Kerke workshop, Nanjing<\/span><\/div><div class=\"ms-slide\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/11\/masterbatch-turnkey-s2.webp\" alt=\"Masterbatch Production Line \u2014 workshop photo 2, Kerke workshop, Nanjing\" loading=\"lazy\"><span class=\"ms-cap\">Masterbatch Production Line \u2014 workshop photo 2, Kerke workshop, Nanjing<\/span><\/div><div class=\"ms-slide\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/11\/masterbatch-turnkey-s3.webp\" alt=\"Masterbatch Production Line \u2014 workshop photo 3, Kerke workshop, Nanjing\" loading=\"lazy\"><span class=\"ms-cap\">Masterbatch Production Line \u2014 workshop photo 3, Kerke workshop, Nanjing<\/span><\/div><div class=\"ms-slide\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/11\/masterbatch-turnkey-s4.webp\" alt=\"Masterbatch Production Line \u2014 workshop photo 4, Kerke workshop, Nanjing\" loading=\"lazy\"><span class=\"ms-cap\">Masterbatch Production Line \u2014 workshop photo 4, Kerke workshop, Nanjing<\/span><\/div><div class=\"ms-slide\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/11\/masterbatch-turnkey-s5.webp\" alt=\"Masterbatch Production Line \u2014 workshop photo 5, Kerke workshop, Nanjing\" loading=\"lazy\"><span class=\"ms-cap\">Masterbatch Production Line \u2014 workshop photo 5, Kerke workshop, Nanjing<\/span><\/div><div class=\"ms-slide\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/11\/masterbatch-turnkey-s6.webp\" alt=\"Masterbatch Production Line \u2014 workshop photo 6, Kerke workshop, Nanjing\" loading=\"lazy\"><span class=\"ms-cap\">Masterbatch Production Line \u2014 workshop photo 6, Kerke workshop, Nanjing<\/span><\/div><div class=\"ms-slide\"><div class=\"ms-video\" data-yt=\"vZrI5FYBMyM\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/11\/masterbatch-turnkey-s1.webp\" alt=\"Running video \u2014 Masterbatch Production Line, Kerke workshop\" loading=\"lazy\"><button type=\"button\" class=\"ms-play\" aria-label=\"Play video\">&#9654;<\/button><\/div><span class=\"ms-cap\">Running video \u2014 Masterbatch Production Line, Kerke workshop<\/span><\/div><\/div>\n<button type=\"button\" class=\"ms-nav prev\" aria-label=\"Previous slide\">&#8249;<\/button>\n<button type=\"button\" class=\"ms-nav next\" aria-label=\"Next slide\">&#8250;<\/button>\n<div class=\"ms-dots\"><button type=\"button\" data-i=\"0\" class=\"ms-dot on\" aria-label=\"Slide 1\"><\/button><button type=\"button\" data-i=\"1\" class=\"ms-dot\" aria-label=\"Slide 2\"><\/button><button type=\"button\" data-i=\"2\" class=\"ms-dot\" aria-label=\"Slide 3\"><\/button><button type=\"button\" data-i=\"3\" class=\"ms-dot\" aria-label=\"Slide 4\"><\/button><button type=\"button\" data-i=\"4\" class=\"ms-dot\" aria-label=\"Slide 5\"><\/button><button type=\"button\" data-i=\"5\" class=\"ms-dot\" aria-label=\"Slide 6\"><\/button><button type=\"button\" data-i=\"6\" class=\"ms-dot\" aria-label=\"Slide 7\"><\/button><\/div>\n<\/div>\n<div class=\"appmedia-text\">\n<section class=\"qa\" id=\"answer\"><nav class=\"wp-block-rank-math-toc-block k3-toc\" aria-label=\"On this page\"><b>On this page:<\/b><a href=\"#rm-s1\">Quick answer<\/a><a href=\"#rm-s2\">What sets the limit<\/a><a href=\"#rm-s3\">Process flow, step by step<\/a><a href=\"#rm-s4\">Equipment configuration<\/a><a href=\"#rm-s5\">Output by model<\/a><\/nav><h2 id=\"rm-s1\">Quick answer<\/h2><p>A masterbatch turnkey line covers feeding, compounding, devolatilization, pelletizing, drying and packing for <strong>filler, colour, black, white and functional masterbatch<\/strong>, at <strong>100\u20134,000 kg\/h<\/strong>. Layout, electrical standard and voltage are built around the customer plant, not a catalogue.<\/p><\/section>\n<\/div>\n<\/div><\/div>\n<div class=\"wrap\"><div class=\"grid\"><main>\n<div class=\"stats\"><div class=\"stat\"><b>250\u2013750 kg\/h<\/b><span>KTE-75\/95 range<\/span><\/div><div class=\"stat\"><b>3 lines<\/b><span>filler, colour, functional<\/span><\/div><div class=\"stat\"><b>turnkey<\/b><span>scope<\/span><\/div><\/div>\n<p class=\"note\">Workshop photos and a running video \u2014 shot on our own lines, not stock images.<\/p>\n\n<h2 class=\"sec\" id=\"limit\" id=\"rm-s2\">What sets the limit<\/h2>\n<p class=\"lead\">Requirement gathering (material, output, pellet standard, plant size, voltage, budget) \u2192 3D layout and screw configuration \u2192 machining and IQC \u2192 assembly with gearbox run-in, no-load and loaded test \u2192 FAT (on site or by video) \u2192 sea-worthy packing \u2192 installation and training.<\/p>\n<div class=\"tw\"><table><caption><b>Table 1.<\/b> Key parameters for masterbatch turnkey production line. Reference values \u2014 confirm on a material trial.<\/caption>\n<thead><tr><th scope=\"col\">Parameter<\/th><th scope=\"col\">Value \/ range<\/th><\/tr><\/thead><tbody><tr><td><b>Scope<\/b><\/td><td>Feeding \u2192 compounding \u2192 pelletizing \u2192 drying \u2192 packing<\/td><\/tr><tr><td><b>Output<\/b><\/td><td>100\u20134,000 kg\/h<\/td><\/tr><tr><td><b>Pelletizing options<\/b><\/td><td>Water ring, strand, underwater, air-cooled hot face<\/td><\/tr><tr><td><b>Electrical<\/b><\/td><td>Voltage\/frequency per destination country<\/td><\/tr><tr><td><b>Delivery<\/b><\/td><td>30\u201345 working days standard; 45\u201370 for custom layouts<\/td><\/tr><tr><td><b>Model<\/b><\/td><td>KTE-50B to KTE-135D, KTE\/SE series<\/td><\/tr><\/tbody><\/table><\/div>\n<p class=\"note\">Output figures are measured on the reference material stated above. Filler grade, bulk density and moisture move output by \u00b115% \u2014 that is why every quotation we issue is tied to a trial report.<\/p>\n\n<h2 class=\"sec\" id=\"process\" id=\"rm-s3\">Process flow, step by step<\/h2>\n<ol class=\"flow\"><li><b>Feeding<\/b>Loss-in-weight dosing of polymer and filler; side feeder or liquid injection where the formulation needs it.<\/li><li><b>Melting and dispersing<\/b>Screw geometry with 45\u00b0\/90\u00b0 kneading blocks; barrel profile set by the polymer.<\/li><li><b>Devolatilization<\/b>Vacuum vent at \u22120.06 to \u22120.09 MPa removes moisture and volatiles before the die.<\/li><li><b>Pressure build-up<\/b>Throttle or discharge section stabilises die pressure; a melt pump where gauge control matters.<\/li><li><b>Pelletizing and packing<\/b>die-face or strand pelletizing, see the pelletizing page; then centrifugal dryer, vibrating screen and bagging.<\/li><\/ol>\n\n<h2 class=\"sec\" id=\"equipment\" id=\"rm-s4\">Equipment configuration<\/h2>\n<div class=\"tw\"><table><caption><b>Table 2.<\/b> What the line is made of, and why each part is specified that way.<\/caption>\n<thead><tr><th scope=\"col\">Stage<\/th><th scope=\"col\">Equipment<\/th><th scope=\"col\">Why this choice<\/th><\/tr><\/thead><tbody>\n<tr><td>Main machine<\/td><td><a href=\"\/machines\/two-stage-extruder\/\">Two-Stage Extruder KTE\/SE<\/a><\/td><td>Architecture follows the filling level and the mixing duty, not the required tonnage.<\/td><\/tr>\n<tr><td>Screw geometry<\/td><td>Building-block elements, W6Mo5Cr4V2, bimetallic liner<\/td><td>Wear package for abrasive filler; mixing blocks only where dispersion demands them.<\/td><\/tr>\n<tr><td>Feeding<\/td><td><a href=\"\/machines\/gravimetric-feeding-system\/\">Loss-in-weight feeder<\/a>, side feeder where needed<\/td><td>Recipe accuracy: \u00b10.5% short term on the weighed component.<\/td><\/tr>\n<tr><td>Pelletizing<\/td><td><a href=\"\/machines\/pelletizing-systems\/\">Pelletizing system<\/a><\/td><td>Chosen by polymer and filler ceiling \u2014 water contact is the deciding column.<\/td><\/tr>\n<tr><td>Downstream<\/td><td>Centrifugal dryer, vibrating screen, bagging<\/td><td>Fines below 2% and moisture below the specification of your downstream process.<\/td><\/tr>\n<\/tbody><\/table><\/div>\n\n<h2 class=\"sec\" id=\"output\" id=\"rm-s5\">Output by model<\/h2>\n<div class=\"tw\"><table><caption><b>Table 3.<\/b> Two-stage KTE\/SE \u2014 reference output. Full range on the <a href=\"\/machines\/two-stage-extruder\/\">machine page<\/a>.<\/caption>\n<thead><tr><th scope=\"col\">Configuration<\/th><th scope=\"col\">Stage 1 (twin screw)<\/th><th scope=\"col\">Stage 2 (single screw)<\/th><th scope=\"col\">Output (kg\/h)<\/th><th scope=\"col\">Typical product<\/th><\/tr><\/thead><tbody><tr><td class=\"num\"><a href=\"\/applications\/kte-50b-se-120\/\">KTE-50B \/ SE-120<\/a><\/td><td class=\"num\">50.5 mm<\/td><td class=\"num\">120 mm<\/td><td class=\"num\">300\u2013500<\/td><td class=\"num\">Colour \/ filler masterbatch<\/td><\/tr><tr><td class=\"num\"><a href=\"\/applications\/kte-65b-se-150\/\">KTE-65B \/ SE-150<\/a><\/td><td class=\"num\">62.4 mm<\/td><td class=\"num\">150 mm<\/td><td class=\"num\">500\u2013800<\/td><td class=\"num\">Filler masterbatch 85%, PVC<\/td><\/tr><tr><td class=\"num\"><a href=\"\/applications\/kte-75b-se-180\/\">KTE-75B \/ SE-180<\/a><\/td><td class=\"num\">71 mm<\/td><td class=\"num\">180 mm<\/td><td class=\"num\">700\u20131,200<\/td><td class=\"num\">High filler 88\u201390%, HFFR<\/td><\/tr><tr><td class=\"num\"><a href=\"\/applications\/kte-95b-se-200\/\">KTE-95B \/ SE-200<\/a><\/td><td class=\"num\">93 mm<\/td><td class=\"num\">200 mm<\/td><td class=\"num\">1,000\u20132,000<\/td><td class=\"num\">High filler, cable compound<\/td><\/tr><\/tbody><\/table><\/div>\n\n<h2 class=\"sec\" id=\"mistakes\" id=\"rm-s6\">Three mistakes that cost the most<\/h2>\n<div class=\"call warn\"><h4>1. Buying machines separately and discovering the conveying, drying and packing equipment doe<\/h4><p>Buying machines separately and discovering the conveying, drying and packing equipment does not fit the plant.<\/p><\/div><div class=\"call warn\"><h4>2. Ignoring the local voltage\/frequency until commissioning week.<\/h4><p>Ignoring the local voltage\/frequency until commissioning week.<\/p><\/div><div class=\"call warn\"><h4>3. Sizing downstream by the catalogue top number<\/h4><p>Sizing downstream by the catalogue top number \u2014 dryer, screener and packer must match the worst-case formulation, and one undersized dryer throttles the whole line.<\/p><\/div>\n\n<h2 class=\"sec\" id=\"faq\" id=\"rm-s7\">FAQ<\/h2>\n<details open><summary>Can you design around my existing building?<\/summary><p>Yes \u2014 send a CAD plan and column grid; we return a 3D layout before quotation.<\/p><\/details><details><summary>What is included in a turnkey quote?<\/summary><p>Main machine, feeders, pelletizer, dryer, conveying, control cabinet, spare parts list, English manual and electrical drawings. Installation and commissioning are quoted separately as man-days.<\/p><\/details><details><summary>What output can you guarantee for this application?<\/summary><p>The reference band is 100\u20134,000 kg\/h, measured on the stated material. We quote a guaranteed figure only after a trial on your own material, because filler grade, bulk density and moisture move output by \u00b115%.<\/p><\/details><details><summary>Can we run our material before ordering?<\/summary><p>Yes \u2014 send 25\u201350 kg. We return pellets, a running video and a report with temperatures, screw speed, feeder settings and output per hour. The trial is free; you cover the freight.<\/p><\/details><details><summary>What is the delivery time?<\/summary><p>30\u201345 working days for standard configurations, 45\u201370 for custom screw geometry and ODM work. Voltage and frequency are built for the destination country.<\/p><\/details>\n\n<div class=\"method\"><h2 id=\"rm-s8\">Where these numbers come from<\/h2>\n<p>Parameters are taken from the Kerke product parameter table and the product master data sheet, and cross-checked against commissioning records for lines in the same application. Formulations and temperature windows are typical industry values, not a recommendation for your specific compound \u2014 every figure marked <em>reference<\/em> must be confirmed on a material trial before it becomes a contractual number.<\/p>\n<p>Reviewed by the Kerke process team, Nanjing. Page updated 6 November 2026.<\/p><\/div>\n\n<div class=\"related\"><h2 id=\"rm-s9\">Related<\/h2><div class=\"rel-grid\"><a class=\"rel\" href=\"\/applications\/filler-masterbatch-line\/\"><span>Application<\/span>Filler Masterbatch Extruder Line<\/a><a class=\"rel\" href=\"\/applications\/color-masterbatch-extruder-line\/\"><span>Application<\/span>Color Masterbatch Extruder Line<\/a><a class=\"rel\" href=\"\/machines\/two-stage-extruder\/\"><span>Machine<\/span>Two-Stage Extruder KTE\/SE (Twin Screw + Single Screw)<\/a><a class=\"rel\" href=\"\/machines\/pelletizing-systems\/\"><span>Machine<\/span>Pelletizing systems: 7 methods compared<\/a><a class=\"rel\" href=\"\/knowledge\/pelletizing-methods-compared\/\"><span>Knowledge<\/span>Seven pelletizing methods compared<\/a><a class=\"rel\" href=\"\/knowledge\/twin-screw-extruder-size-chart\/\"><span>Knowledge<\/span>Twin screw size chart, 16\u2013135 mm<\/a><\/div><\/div>\n<div class=\"cta\"><div><b>Tell us your material \u2014 we will tell you the line<\/b><p>Send 25\u201350 kg and we run it on our lab extruder: pellets, running video and a capacity report back in 3\u20137 days.<\/p><\/div>\n<div class=\"acts\"><a href=\"\/get-a-quote\/\">Get a quote<\/a>\n<a class=\"alt\" href=\"\/get-a-quote\/#trial\">Send material for trial<\/a><\/div><\/div>\n<\/main>\n<aside><h5>On this page<\/h5><ol><li><a href=\"#answer\">Quick answer<\/a><\/li><li><a href=\"#limit\">What sets the limit<\/a><\/li><li><a href=\"#process\">Process flow<\/a><\/li><li><a href=\"#equipment\">Equipment configuration<\/a><\/li><li><a href=\"#output\">Output by model<\/a><\/li><li><a href=\"#mistakes\">Costly mistakes<\/a><\/li><li><a href=\"#faq\">FAQ<\/a><\/li><\/ol>\n<div class=\"sidecard\"><b>Which line for your filling level?<\/b>\n<p>Below 85% one twin screw is enough; above it, architecture changes. Tell us the number before we talk tonnage.<\/p>\n<a class=\"btn\" href=\"\/get-a-quote\/\">Ask an engineer<\/a>\n<a class=\"btn ghost\" href=\"\/applications\/\">Browse by material<\/a><\/div>\n<\/aside><\/div><\/div>\n<script>\n(function(){\n  var root=document.getElementById('appslider'); if(!root) return;\n  var slides=[].slice.call(root.querySelectorAll('.ms-slide'));\n  var dots=[].slice.call(root.querySelectorAll('.ms-dot'));\n  var cur=0, timer=null, locked=false;\n  function show(i){\n    cur=(i+slides.length)%slides.length;\n    slides.forEach(function(s,j){\n      s.classList.toggle('on', j===cur);\n      var v=s.querySelector('.ms-video');\n      if(j!==cur && v){ var f=v.querySelector('iframe');\n        if(f){ f.remove(); var p=v.querySelector('.ms-play'); if(p) p.style.display=''; } }\n    });\n    dots.forEach(function(d,j){ d.classList.toggle('on', j===cur); });\n    var v=slides[cur].querySelector('.ms-video');\n    if(v){ locked=true; stop(); playVideo(v); }\n  }\n  \/* \u81ea\u52a8\u64ad\u653e\uff1a3s \u4e00\u5f20\uff1b\u60ac\u505c\u6682\u505c\uff0c\u79fb\u51fa\u6062\u590d\uff1b\u8f6e\u5230\u89c6\u9891\u81ea\u52a8\u9759\u97f3\u64ad\u653e\u5e76\u505c\u7559\uff08locked\uff09\uff0c\u624b\u52a8\u5207\u6362\u540e\u6062\u590d\u8f6e\u64ad *\/\n  function start(){ if(timer || document.hidden || locked) return; timer=setInterval(function(){ show(cur+1); }, 3000); }\n  function stop(){ if(timer){ clearInterval(timer); timer=null; } }\n  function playVideo(v){\n    if(v.querySelector('iframe')) return;\n    var f=document.createElement('iframe');\n    f.src='https:\/\/www.youtube.com\/embed\/'+v.dataset.yt+'?autoplay=1&mute=1&rel=0';\n    f.setAttribute('allow','autoplay; encrypted-media; picture-in-picture');\n    f.setAttribute('allowfullscreen','');\n    var p=v.querySelector('.ms-play'); if(p) p.style.display='none';\n    v.insertBefore(f, p);\n  }\n  function manual(i){ locked=false; show(i); start(); }\n  document.addEventListener('visibilitychange', function(){ if(document.hidden) stop(); else start(); });\n  root.addEventListener('mouseenter', stop);\n  root.addEventListener('mouseleave', function(){ if(!locked) start(); });\n  root.querySelector('.prev').addEventListener('click', function(){ manual(cur-1); });\n  root.querySelector('.next').addEventListener('click', function(){ manual(cur+1); });\n  dots.forEach(function(d){ d.addEventListener('click', function(){ manual(+d.dataset.i); }); });\n  root.addEventListener('click', function(e){\n    var p=e.target.closest('.ms-play'); if(!p) return;\n    locked=true; stop(); playVideo(p.parentNode);\n  });\n  show(0);\n  start();\n})();\n<\/script>\n<script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@graph\": [{\"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Can you design around my existing building?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes \u2014 send a CAD plan and column grid; we return a 3D layout before quotation.\"}}, {\"@type\": \"Question\", \"name\": \"What is included in a turnkey quote?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Main machine, feeders, pelletizer, dryer, conveying, control cabinet, spare parts list, English manual and electrical drawings. Installation and commissioning are quoted separately as man-days.\"}}, {\"@type\": \"Question\", \"name\": \"What output can you guarantee for this application?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The reference band is 100\u20134,000 kg\/h, measured on the stated material. We quote a guaranteed figure only after a trial on your own material, because filler grade, bulk density and moisture move output by \u00b115%.\"}}, {\"@type\": \"Question\", \"name\": \"Can we run our material before ordering?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes \u2014 send 25\u201350 kg. We return pellets, a running video and a report with temperatures, screw speed, feeder settings and output per hour. The trial is free; you cover the freight.\"}}, {\"@type\": \"Question\", \"name\": \"What is the delivery time?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"30\u201345 working days for standard configurations, 45\u201370 for custom screw geometry and ODM work. Voltage and frequency are built for the destination country.\"}}]}, {\"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/www.kerkepm.com\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Applications\", \"item\": \"https:\/\/www.kerkepm.com\/applications\/\"}, {\"@type\": \"ListItem\", \"position\": 3, \"name\": \"Masterbatch Production Line\"}]}]}<\/script>\n<div class=\"wrap\"><section class=\"k3-more\" id=\"rm-more\"><h2>Masterbatch production line \u2014 the short version<\/h2><p>Note on masterbatch production line: the numbers above are reference ranges from Kerke's own trial runs, not catalogue promises. Screw geometry, wear package and pelletizing method are set on the trial bench first, so the output you compare is the output you get. If your grade is not in the tables, send it \u2014 the closest configuration is usually a change of screw set, not a different machine.<\/p><p class=\"k3-rel\"><b>Related on this site:<\/b> <a href=\"\/machines\/co-rotating-twin-screw-extruder\/\">Machine range: KTE-50B to 135D<\/a> \u00b7 <a href=\"\/knowledge\/pelletizing-methods-compared\/\">Pelletizing methods compared<\/a> \u00b7 <a href=\"\/get-a-quote\/\">quotation and free trial<\/a> \u00b7 <a href=\"https:\/\/en.wikipedia.org\/wiki\/Masterbatch\" target=\"_blank\" rel=\"noopener\">Wikipedia: Masterbatch<\/a><\/p><\/section><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Home\/Applications\/Masterbatch Production Line Application \u00b7 Plastic Masterbatch Masterbatch Production Line: Filler, Color &#038; Functional in One Plant A masterbatch plant is a feeding system, an extruder, a pelletizer and a material-handling skeleton. Buying them as four separate decisions is how plants end up with a bottleneck at the bagging station. A reference masterbatch production line [&#8230;]\n","protected":false},"author":0,"featured_media":1695,"parent":23,"menu_order":17,"comment_status":"closed","ping_status":"closed","template":"page-blank.php","meta":{"footnotes":""},"application":[34],"app_group":[16],"class_list":["post-32","page","type-page","status-publish","has-post-thumbnail","hentry","application-masterbatch-turnkey","app_group-masterbatch"],"_links":{"self":[{"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/pages\/32","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/comments?post=32"}],"version-history":[{"count":0,"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/pages\/32\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/pages\/23"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/media\/1695"}],"wp:attachment":[{"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/media?parent=32"}],"wp:term":[{"taxonomy":"application","embeddable":true,"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/application?post=32"},{"taxonomy":"app_group","embeddable":true,"href":"https:\/\/kerkepm.com\/es\/wp-json\/wp\/v2\/app_group?post=32"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}